In October 2022, after hearing the overview of the proposed project, the Village Board authorized a contract with Sullivan Architecture to develop a design for the Fire House and Municipal Complex in order to arrive at a solid cost estimate. The cost estimate was necessary to determine project financing.

Although the major spaces in the building along with assumptions about the look of the fa├žade have been drafted, they are not final. If the referendum is successful, there will be an opportunity for community input on the final look of the facility. 